Plant construction in Tangstedt
State-of-the-art process: Our production in Tangstedt
Another state-of-the-art NeoOil P5 pyrolysis plant is currently being built in our modern production facility in Tangstedt (near Hamburg). Here, all components are individually assembled, carefully calibrated, and coordinated according to the specific requirements of each customer.
Before a system is delivered, it undergoes a comprehensive testing phase. This includes a signal test (dry test/factory test) to ensure that all processes are optimally tailored to the respective raw material profile.
During this phase, our engineers make numerous fine-tuning and performance optimizations. Each step is documented, measured, and analyzed to ensure system control for final commissioning at the customer's site.
After successful completion of all tests and inspections, a final approval is issued by our FAT (Factory Acceptance Test) – supervised by an independent third party (SGS). The system is then disassembled into its main components, securely packaged for transport, and delivered to its destination – ready for installation, commissioning, and productive operation.
In Tangstedt, precision, experience and state-of-the-art technology create the foundation for a sustainable circular economy – Made by enespa.
enespa in brief
Comprehensive solutions for the circular economy
Development, construction and operation of modular, energy-efficient recycling plants for plastic waste, tire pyrolysis and oil refining.
Diverse business areas
Chemical and thermal recycling, commodity production (AdBlue, PET, LDPE), laboratory services and trading in UREA, carbon black and pyrolysis oil.
International presence
Technological advance
Sustainable vision
Growth-oriented company
- All
- Investor Relations
- Research laboratory
- System Engineering
- Plant operation
- Persons
- For the cause






